FAQs
Frequently asked questions
The site and planning
-
The site is located on land at Prestbury Road, immediately adjacent to the northern edge of the existing Macclesfield settlement boundary.
-
To the north/north west (and outside of the site boundary) is an area of woodland - Upton Wood - and beyond this lies Upton Hall set within predominantly open agricultural land. The River Bollin runs through the Macclesfield Riverside Park Local Nature Reserve just beyond the site’s north-eastern boundary. Residential properties are located to the south and east.
-
The site comprises c.16 hectares of mostly open arable land with occasional trees and tree belts.
-
A Reserved Matters Planning Application has now been submitted to Cheshire East Council. This sets out the detail of the scheme now that the principle of development has been established through the outline planning consent.
-
Outline planning permission was granted by the Planning Inspector at Appeal in August 2026. This decision established that the principle of residential development was acceptable on the site.
The Cheshire East Local Plan Strategy 2010 – 2030 planned for 4,250 new homes to be delivered in Macclesfield (including allocated and non-allocated sites). However, despite being almost 15 years through the 20-year plan period, only 2,261 new homes have been delivered in Macclesfield (as of 31st March 2024). This under-delivery does not reflect a reduction in need, but has occurred as a result of the slow rate at which land allocated for housing has received planning permission and progressed to construction.
Similarly, the Government has recently introduced changes to the National Planning Policy Framework (NPPF), which is integral to its ambition to deliver 1.5 million new homes within the five-year Parliamentary term. The changes re-introduce mandatory housing requirements and change the ‘standard method’ for calculating housing need. This change results in a significant increase to Cheshire East’s local housing need compared to the previous method.
-
During the design process, different options for the long-term ownership and maintenance of the landscaped buffer between existing and proposed properties were considered, including the potential transfer of land to neighbouring residents. Following further review, it was concluded that this approach would not provide a practical or consistent long-term management solution for legal, planning and operational reasons. The buffer forms part of a wider landscape strategy for the development and is intended to be managed as a coordinated area to ensure its appearance, maintenance and function are maintained over time in accordance with the outline planning permission requirements and protected by a robust restrictive covenant regime. The reserved matters proposals therefore retain the buffer as part of the development's landscaping framework, ensuring a clear and consistent approach to its future management while continuing to provide separation and screening between existing and proposed homes.
Highways and access
-
The vehicular access for the site comes from Prestbury Road. New cycle and pedestrian pathways will also be provided to increase access towards Macclesfield Riverside Park. Access arrangements were approved as part of the appeal process.
-
Parking will be provided in line with Appendix C of the Local Plan Strategy. One-bedroom homes will have one space per dwelling; two- and three-bedroom homes will have two spaces per dwelling, with garages provided for three-bedroom detached homes; and homes with four or more bedrooms will have three spaces per dwelling, including garages where applicable.
Housing
-
The proposals comprise a mix of one- to five-bedroom homes. The overall mix includes 18 one-bedroom homes, 37 two-bedroom homes, 72 three-bedroom homes, 68 four-bedroom homes and 5 five-bedroom homes.
-
Yes. The scheme proposes 90 affordable homes, representing 45% of the 200 homes overall. This includes 55 rented homes and 35 shared ownership homes, alongside 110 homes for private sale.
-
The development will strive to include a range of measures which support sustainable development, providing economic, social and environmental benefits in line with national and local planning requirements. Bloor Homes commits to meeting the Future Homes Standards, focusing on carbon reduction and low carbon renewable energy provision.
-
Best practice urban design principles state that as a minimum, the back-to-back distance between properties must be 21m (i.e. a minimum garden length of 10.5m for individual properties). At present, some of the properties adjoining the eastern boundary of the site along Bollinbarn Drive have fairly shallow gardens. To establish a further degree of separation between the proposed and existing properties, an additional 5m ‘no build’ easement will be provided to the rear of proposed gardens along the eastern boundary of the site. This is in accordance with the approved Parameters Plan, which is the plan that establishes the overall parameters for the site. This landscape treatment, coupled with the existing depths of gardens along Bollinbarn Drive, establishes back-to-back distances of at least 24m between the proposed properties and the majority of existing properties along Bollinbarn Drive.
Heritage
-
The potential impact of the development on the significance of nearby heritage assets has been considered from an early stage in the design process. Grade II listed Upton Hall and the Prestbury Road Macclesfield Conservation Area have informed the proposed layout and extent of the residential development zone, which has been pulled considerably away from Prestbury Road to the south west and the ancient woodland to the north and west. This will reduce the visibility of the proposed dwellings from within the immediate context of the heritage assets to ensure that their semi-rural setting is preserved.
Flooding
-
An attenuation basin has been located in the north-eastern field of the site. To manage rainwater runoff from the development, a drainage strategy has been developed that routes surface water via a sustainable drainage system (SuDs) and the site’s natural topography into the attenuation basin, whilst ensuring not to increase wider runoff rates or risks of flooding elsewhere.
Construction and future development
-
A Construction Management Plan will be agreed with Cheshire East Council prior to any construction beginning, which would address many potential issues from the outset.